We’re done assembling the first eWhammy batch. Next up is one last, thorough round of testing, then we ship. Can’t get enough! One final test pass before it leaves the shop. Target shipping: first week of March.
If you haven’t ordered yet, it’s still not too late to get into the first batch. A few folks have already paid the reservation fee but haven’t pulled the trigger, and I’m not sure what’s holding you back. There are also people who raised their hand in the initial interest survey.
We’d really love to understand what’s stopping you. Is it a limitation, a usability concern, something about the design, or something else entirely?
If you can spare a minute, I’d really appreciate it if you could tick a quick checklist. It’ll help us polish the eWhammy.
Alternatively, for specific concerns, you can also send us a message at [email protected]. We’d love to hear from you.
The core design is final, and we’ll be shipping it in its current form with no delays. That said, the system is modular. Depending on complexity, we may be able to develop optional add-ons to better suit your specific use case.
Here’s the eWhammy product page:
https://www.cycfi.com/product/ewhammy/